PLAN AND CONSTRUCTION DRAWINGS UPDATE

I proposed a new plan which is in a a shape of a Hexagon according to the placement of the 7 static narratives. The triangular grid is 50 x 50 metres wide and acts as both the dynamic grid and the column grid. However, I need to fix this as it is too wide for spacing between the columns. 

The section throughout the shopping mall able you to see the different levels. The mall and the service level underneath and how the circulation route for the visitors and the service is located.


This is a digram showing the method of the cut and cover construction which I need to fix as the sand actually need to be replaced instead of the water before construction. All in all, the under water construction would not associate with any water elements.

This is the construction method for the tunnel boring of the transportation tunnel. The tunnel will be structured with truss system and concrete walls. 

There are 3 circulation routes proposed. The red are the service tunnel, the yellow is the customer tunnel and the blue line is the water transportation above ground. The circulation routes will run around the Hexagon plan and provide entrances and drop of point at each edge point

The moving walls diagram is specific to the grid which the walls will run through a series of straight  lines and 2 diagonal lines above. 