Friday, October 19, 2012

Re_Surface:site analysis

Site Analysis base on the environment of the site that
impact to the design development
included
   - Transportation
    - Exist building 
    - Exist building Height
    - Possible entrance for the project
And natural aspect of site
such as
     wind
     temperature
     sun
      etc.


               
               Then we have enough data to simulate the shadow of the exist building nearby in
different time and season to design the opening  that fit to shade in specific times

           The exist building also give the viewpoint to the underground below, to understand
what we should see from the site I visualize it with 3d modeling tool scene by scene 
from the underground 

This is  for now  more will coming soon : )  



Dubai Marina Mall Hotel and Serviced Residences

1 comment:

  1. Looking good Shane. The 3D model will be essential for the design so go ahead and model the buildings, infrastructure and topography in more detail. With this we can later look at more advanced software to simulate the weather conditions.
    What about your commercial report?
    And your taxonomy? A continuation from our case study axo's will be great and essential. Of the natural and the artificial natural phenomenons.
    Keep it up!

    ReplyDelete